Cost reduction in material handling

Cost reduction in material handling: Building materials company simplifies wiring thanks to ASi (2:10)

LIP Bygningsartikler saves now 22% of the total cost on their conveyor modules thanks to an ASi solution from Bihl+Wiedemann. Each module and the complete system is connected through an ASi network with integrated safety from Bihl+Wiedemann. New conveyor modules can be added simply without additional wiring from the main PLC.

Products and Solutions

Video Tutorials

English

(only with Registration)

 

General Tutorials 

 

ASIMON360 Tutorials


Software Tutorials


PLC specific Tutorials

 

 

For many of our Video Tutorials Quick Start Guides in PDF format are available as well

Applications